Parcel Id: 07-11-31-7034-00960-0060 |
CONDITIONED SPACE: 2387 sqft |
OPENED PORCH (WITH ROOF) : 371 sqft |
OPENED PORCH (WITH ROOF) : 89 sqft |
GARAGE: 707 sqft |
Total Square Footage: 3554 sqft |
Block: 00960 |
Subdivision: 2165 - SECTION 34-EASTHAMPTON |
Job Phone: 407-580-2657 |
Location Address: 3 EVANSTON PL |
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
Issue Date: 11/17/2023 |
NOC: RECORDED |
Applicant name: GENE WARREN SLONE |
Owner: VICARIO PAUL & YOLANDA Y H&W |
Address 809 RENAISSANCE DR WILLIAMSTOWN, NJ 08094 |
Lot: 0060 |
Contracted Stated Job Value: ¤790,000.00 |
Job Description: Single Family Home |
Type: CN |
Type | Request Date | Result | Inspector |
INSULATION | 05/28/2024 | | RSIMS |
Note: Inspector Notes from Inspection 24205/21/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Nail plates in laundry room are incomplete. Only 1 installed at the double top plate.2). Please repair your silt fence and keep it maintained throughout the build process to avoid failed inspections with fee. FBC 3307.15/14/2024 - PREVIOUS INSPECTION NOTES5/14/24:1). Missing Nail Plates for wire protection: (Marked with NP where needed) - 2-laundry / 2-left side / 1-middle closet / 2-Master Bedroom / 1-garage. Please check all that are under 1-1/4" minimum from stud/plate face.2). No water pressure.3). Shower faucet plumbing is incomplete. 4). Wires for Mechanical equipment are not phased out.5). Kitchen exhaust is missing the 3 screws at connections as required. M1601.4.1Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint.6). Shingles installed but dryer gooseneck & plumbing vent stack boots are not installed.7). Need a revision for the different windows installed (5823.1) than what shows on the submitted product approval sheet. |
ALL ROUGH | 05/21/2024 | APPROVED - AS NOTED | RSIMS |
Note: 5/21/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Nail plates in laundry room are incomplete. Only 1 installed at the double top plate.2). Please repair your silt fence and keep it maintained throughout the build process to avoid failed inspections with fee. FBC 3307.15/14/2024 - PREVIOUS INSPECTION NOTES5/14/24:1). Missing Nail Plates for wire protection: (Marked with NP where needed) - 2-laundry / 2-left side / 1-middle closet / 2-Master Bedroom / 1-garage. Please check all that are under 1-1/4" minimum from stud/plate face.2). No water pressure.3). Shower faucet plumbing is incomplete. 4). Wires for Mechanical equipment are not phased out.5). Kitchen exhaust is missing the 3 screws at connections as required. M1601.4.1Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint.6). Shingles installed but dryer gooseneck & plumbing vent stack boots are not installed.7). Need a revision for the different windows installed (5823.1) than what shows on the submitted product approval sheet. |
ALL ROUGH | 05/14/2024 | Disapproved -FEE REQUIRED | RSIMS |
Note: 5/14/24:1). Missing Nail Plates for wire protection: (Marked with NP where needed) - 2-laundry / 2-left side / 1-middle closet / 2-Master Bedroom / 1-garage. Please check all that are under 1-1/4" minimum from stud/plate face.2). No water pressure.3). Shower faucet plumbing is incomplete. 4). Wires for Mechanical equipment are not phased out.5). Kitchen exhaust is missing the 3 screws at connections as required. M1601.4.1Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint.6). Shingles installed but dryer gooseneck & plumbing vent stack boots are not installed.7). Need a revision for the different windows installed (5823.1) than what shows on the submitted product approval sheet. |
LATH/BRICK/ WATER BARRIER | 05/14/2024 | APPROVED | RSIMS |
ROOF VALLEY & METAL | 04/17/2024 | APPROVED | RSIMS |
Note: 4/16/2024 - PREVIOUS INSPECTION NOTES4/16/24: Previously noted 2 ply truss 28 remains unresolved. (2 rows - 4"OC). Please look at highlighted information on plans as stated before.Previously listed item 1 below: The flashing needs to be mechanically fastened to the wall with drive pins, tapcons or similar. Roof cement alone is not a sufficient means of attaching.4/10/2024 - PREVIOUS INSPECTION NOTES4/10/24: 1). 5" x 5" wall flashing needs to be sealed to the wall along the top leg as required by Manufacturer.2). 5" x 5" flashing at left side of entry needs to be anchored to concrete wall and sealed as required.* Also, 2ply truss 28 still needs to be connected as required on MiTek along the bottom cord.Inspector Notes from Inspection 24603/28/24: Must be complete by next inspection.1). 2ply trusses - 08, 22 and 28 are not connected as required. Highlighted on MiTek. Each row has to meet OC spacing individually. 2). 09 truss has a split web which will need repair per MiTek requirements.Inspector Notes from Inspection 2450Check the following by next inspection1. missing blocking at panel edges (paned edges cannot be properly nailed at collumns, missing blocking/backing) Peer manufacturer specs2. Need repairs to silt fence by next inspection (right side fence is down) |
ROOF VALLEY & METAL | 04/16/2024 | Disapproved -FEE REQUIRED | RSIMS |
Note: 4/16/24: Previously noted 2 ply truss 28 remains unresolved. (2 rows - 4"OC). Please look at highlighted information on plans as stated before.Previously listed item 1 below: The flashing needs to be mechanically fastened to the wall with drive pins, tapcons or similar. Roof cement alone is not a sufficient means of attaching.4/10/2024 - PREVIOUS INSPECTION NOTES4/10/24: 1). 5" x 5" wall flashing needs to be sealed to the wall along the top leg as required by Manufacturer.2). 5" x 5" flashing at left side of entry needs to be anchored to concrete wall and sealed as required.* Also, 2ply truss 28 still needs to be connected as required on MiTek along the bottom cord.Inspector Notes from Inspection 24603/28/24: Must be complete by next inspection.1). 2ply trusses - 08, 22 and 28 are not connected as required. Highlighted on MiTek. Each row has to meet OC spacing individually. 2). 09 truss has a split web which will need repair per MiTek requirements.Inspector Notes from Inspection 2450Check the following by next inspection1. missing blocking at panel edges (paned edges cannot be properly nailed at collumns, missing blocking/backing) Peer manufacturer specs2. Need repairs to silt fence by next inspection (right side fence is down) |
ROOF VALLEY & METAL | 04/10/2024 | Disapproved - NO FEE | RSIMS |
Note: 4/10/24: 1). 5" x 5" wall flashing needs to be sealed to the wall along the top leg as required by Manufacturer.2). 5" x 5" flashing at left side of entry needs to be anchored to concrete wall and sealed as required.* Also, 2ply truss 28 still needs to be connected as required on MiTek along the bottom cord.Inspector Notes from Inspection 24603/28/24: Must be complete by next inspection.1). 2ply trusses - 08, 22 and 28 are not connected as required. Highlighted on MiTek. Each row has to meet OC spacing individually. 2). 09 truss has a split web which will need repair per MiTek requirements.Inspector Notes from Inspection 2450Check the following by next inspection1. missing blocking at panel edges (paned edges cannot be properly nailed at collumns, missing blocking/backing) Peer manufacturer specs2. Need repairs to silt fence by next inspection (right side fence is down) |
ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/28/2024 | APPROVED - AS NOTED | RSIMS |
Note: 3/28/24: Must be complete by next inspection.1). 2ply trusses - 08, 22 and 28 are not connected as required. Highlighted on MiTek. Each row has to meet OC spacing individually. 2). 09 truss has a split web which will need repair per MiTek requirements.Inspector Notes from Inspection 2450Check the following by next inspection1. missing blocking at panel edges (paned edges cannot be properly nailed at collumns, missing blocking/backing) Peer manufacturer specs2. Need repairs to silt fence by next inspection (right side fence is down) |
WALL SHEATHING | 03/25/2024 | APPROVED - AS NOTED | LMILLER |
Note: Check the following by next inspection1. missing blocking at panel edges (paned edges cannot be properly nailed at collumns, missing blocking/backing) Peer manufacturer specs2. Need repairs to silt fence by next inspection (right side fence is down) |
TIE BEAM / LINTEL | 02/16/2024 | APPROVED | RSIMS |
FOUND SURVEY APPROVED (OFFICE) | 02/06/2024 | APPROVED | TBAKER |
MONOLITHIC SLAB | 01/25/2024 | APPROVED | RSIMS |
Note: 1/23/2024 - PREVIOUS INSPECTION NOTES1/23/24: * 6 mil plastic has blown off of slab area. Please re-secure at seams thoroughly to prevent a re-occurrence.1/19/2024 - PREVIOUS INSPECTION NOTES1/19/24: 1). Rear Middle column footer has rebar that does not have the minimum 3" ground clearance as required.2). Rear footer has roots that need to be removed. Highlighted on plan.* Please clean out minor washin dirt throughout a few areas of the footers to maintain 3" clearance for rebar. |
MONOLITHIC SLAB | 01/23/2024 | Disapproved -FEE REQUIRED | RSIMS |
Note: 1/23/24: * 6 mil plastic has blown off of slab area. Please re-secure at seams thoroughly to prevent a re-occurrence.1/19/2024 - PREVIOUS INSPECTION NOTES1/19/24: 1). Rear Middle column footer has rebar that does not have the minimum 3" ground clearance as required.2). Rear footer has roots that need to be removed. Highlighted on plan.* Please clean out minor washin dirt throughout a few areas of the footers to maintain 3" clearance for rebar. |
MONOLITHIC SLAB | 01/19/2024 | Disapproved - NO FEE | RSIMS |
Note: 1/19/24: 1). Rear Middle column footer has rebar that does not have the minimum 3" ground clearance as required.2). Rear footer has roots that need to be removed. Highlighted on plan.* Please clean out minor wash-in dirt throughout a few areas of the footers to maintain 3" clearance for rebar. |
PLUMBING 1ST ROUGH UNDERGROUND | 01/12/2024 | APPROVED - AS NOTED | MGIBSON |
Note: HAVE CORRECT PLUMBING SUB CONTRACTOR CHANGED TO CORRECT ONE BY NEXT INSPECTION |
WATER METER INSTALLATION REQUEST | 12/04/2023 | APPROVED | CBOWERMASTER |
Note: 11/22/2023 3:16:42 PM- PREVIOUS INSPECTION NOTES wooded lot |
WATER METER INSTALLATION REQUEST | 11/22/2023 | Disapproved -FEE REQUIRED | CBOWERMASTER |
Note: wooded lot |
BLD - BUILDING FINAL | | | |
PEP TANK INSTALLATION REQUEST | | | |
U-CROSS CONNECTION | | | |
ROW- PRE-APRON (PRE-POUR) | | | |
ROW - FINAL APRON (AFTER POUR) | | | |
ROW - FINAL SURVEY (OFFICE USE ONLY) | | | |
FIELD SURVEY | | | |
ROW - STORMWATER FINAL | | | |
U -UTILITY RESIDENTIAL FINAL | | | |
GRAVITY SEWER TEST | | | |
SEWER TIE IN | | | |
ELECTRIC - EARLY POWER | | | |
Department | Status | Date In | Date Out |
BLD | COMPLETE | 05/14/2024 | 05/20/2024 |
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COMKS |
ZON | COMPLETE | 02/06/2024 | 02/06/2024 |
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM |
ENGIN1 | COMPLETE | 02/06/2024 | 02/06/2024 |
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
ZON | COMPLETE | 01/10/2024 | 01/10/2024 |
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
ZON | COMPLETE | 11/06/2023 | 11/08/2023 |
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM |
ELEC | COMPLETE | 11/06/2023 | 11/07/2023 |
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
SW1 | COMPLETE | 11/06/2023 | 11/17/2023 |
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM |
ENGIN1 | COMPLETE | 11/06/2023 | 11/07/2023 |
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
SWALE | COMPLETE | 10/16/2023 | 12/05/2023 |
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
BLD | COMPLETE | 10/13/2023 | 10/14/2023 |
Note: Released By: JPI |
CUSVC | COMPLETE | 10/13/2023 | 10/16/2023 |
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM |
ELEC | HOLD | 10/13/2023 | 10/16/2023 |
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM1. Submit a 400 amp riser diagram. |
ENGIN1 | COMPLETE | 10/13/2023 | 10/16/2023 |
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
GAS | CANCEL | 10/13/2023 | 10/16/2023 |
LOCATE | COMPLETE | 10/13/2023 | 10/17/2023 |
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM |
MECH | COMPLETE | 10/13/2023 | 10/16/2023 |
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
SW1 | HOLD | 10/13/2023 | 10/24/2023 |
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COMSod elevations adjacent to the structure are 4” below the FFE for block and 6” forwood frame structures. (D)Culvert material and size to be depicted. Typical is 17X13 CMP (L) |
ZON | HOLD | 10/13/2023 | 10/16/2023 |
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COMMust have separation between front of home with walkway and additional foundation plantings.Provide NEW Site plan and Landscape plan showing the separation. |
BADMIN | COMPLETE | 10/13/2023 | 10/16/2023 |
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |